It is possible to show automatically the operation tool path after its creation. The eyes will be opened in the operations manager.
NC Operations Manager Display new operations' tool path |
Machining stage |
Select the default columns
Verify Clashes technos points User message |
If an operation is executed, the check marks relative to the verification and clashes research are automatically deleted.
In the example below:
The facing operation N°1 has been verified, no collision was detected.
The side milling operation N°2 has not been verified and technological points have been added on the operations.
The drilling operation N°3 has been verified, a collision was detected.
CAM
Part 1 Facing Side milling Drilling |
The following icon
allows to manually modify the colums to display in the operations manager.Once the document is saved, the columns display is kept for this document.